Laserfiche WebLink
• Mine Area Yoast - Nadce Pit <br />Project Hichwall Reduction <br />Task Doze Niahwall Material <br />into Open Pi[ <br />NORKS HE ET N0. NA-5 <br />PRODUCTIVITY FOR D02ER USE - GRADING <br />Dozing Activity: Doze highwall material into open pit <br />Dozer Used: D-11N, U-Blade <br />Description of Dozing 150 Push <br />Volume: 419,225 BCY <br />490,493 LCY <br />Productivity Calculations: <br />Operating: 75 <br />Grade: see EMF <br />• Material Factor: see EMF <br />Push Distance: see EMF <br />Dozing Factor: see EMF <br />Visibility; 90 <br />Altitude: 91 <br />Dual Tilt: 105 <br />Spoil Pile Factor: see EMF <br />Minutes Norked per Hour: 50 <br />Bank Materiel Density: see EMF <br />Loose Material Density: see EMF <br />Direct Drive Trans: 100 <br />Total Adj. Factor: 0.3139 <br />Cost Per Hour = 5198.94 <br />Total Cost = 849 hrs. x 5198.94 cost/hr = 5168.900 <br />REFERENCES: <br />Table 25-2-3 <br />Attachment 25-2 <br />• EMF Worksheets <br />Attachment 25-6 <br />25-3-5 Revised 03/27/95 <br />