Laserfiche WebLink
Mine Area Yoast - Wadge Pit <br />Project Backfill Open Pii __ <br />Task Doze Adiecent Spoil <br />NORKSHEET N0. WA-6 <br />PRODUCTIVITY FOR D02ER USE - GRADING <br />Dozing Activity: Doze adjacent 1 spoil into pit <br />Dozer Used: D-11N, U-Blade <br />Description of Dozing 100 Push <br />Volume: 213,666 BCY <br />249.989 LCY <br />Productivity Calculations: <br />Operating: 75 <br />Grade: see EMF • <br />Material Factoct see EMF <br />Push Distance: see EMF <br />Dozing Factor: see EMF <br />Visibility: 90 <br />Altitude: 91 <br />Dual Tilt: 105 <br />Spoil Pile Factor: see EMF <br />Minutes Norked per Hour: 50 <br />Bank Material Density: see EMF <br />Loose Material Density: see EMF <br />Direct Drive Trans: 100 <br />ToCal Adj. Factor: 0.6035 <br />Cost Per Hour = 5198.94 <br />total Cost = 156 hrs. x 5198.94 cost/hr = 531.034 <br />REFERENCES: <br />Table 25-2-3 <br />Attachment 25-2 • <br />EMF Worksheets <br />Attachment 25-6 <br /> 25-3-6 Revised 03/27/95 <br />