Laserfiche WebLink
Mine Area Yoest - Vad9e Pit <br />Project Highwall Reduction <br />Task Drill 8 Shoot Highwall <br />YOR KSHEET N0. YA -4 <br />OTHER RELLAMATIOH ACTIVITY COSTS <br />Total No. Holes = 3600 ' = 133 Rows x b roles/Row 798 Holes <br />Total Feet of Drilling <br />102 ft/row x 133 rows <br />Avg. Drilling Rete <br />Time = 13.566 ft. <br />2 ft/min x 60 m <br />27' <br />Required <br />= 13,566 .f t. <br />= 2 ft/nii n. <br />= 113 hrs. <br />in/hr <br />Cost Estimate Laloulations: <br />Drilling Cost = (113 hr. x 230.37/hr.) <br />= 526,032 <br />1.7 bits 8 51500/bit (2,550 <br />Total Amount of Exo(osives <br />915 lbs/row x 133 rows = 121,695 lbs. <br />Explosives: 50.15/l b. x 121,695 lb. = f18,255 <br />TOTAL = 246.837 <br /> <br />• <br /> <br />25-3-4 <br />Revised 03/01/95 <br />