My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE59238
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE59238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:01:32 PM
Creation date
11/20/2007 6:11:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
6/29/2004
Section_Exhibit Name
2.05 Operation and Reclamation Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
52.05 APPLICATION FOR PERMIT FOR SIIRFACE OR UNDERGROUND MINING ACTIVITIES -- <br />MINIMUM REQUIREMENTS FOR OPERATION AND RECLAMATION PLANS. <br />`.. -- <br />• ! 2.05.6 Mitigation of Surface Coal Mining Operation Impacts. (Con['d,) <br />(3) (b) (i) (Cont'd.) <br />•~. <br />1. The upper diversion ditches; <br />2. The mine site drainage; <br />3. The culvert below the portal level fill <br />embankment to route Ea s[ Roatcap Creek <br />drainage through the permit area; <br />4. The sedimentation pond; <br />5. Fill embankment outslopes; and <br />6. The water tank and vent shaft drainage and <br />dugout pond, <br />The upper diversion ditches divert storm run- <br />off from the upper basin. The ditch calcula- <br />tions may be found in the Fydrology Appendix. <br />Trre.~ ditches dtscharRe water into adjacent <br />areas north of the mine site. The ditch is <br />designed to carry runoff from a 10-year, 24- <br />hour storm event. <br />Runoff flow generated from the mine site dis- <br />turbance is handled by drainage ditches locat- <br />ed on the north perimeter of the portal level <br />cut and fill embankment. The other areas in <br />the portal level cut and fill have been graded <br />and localized drainage ditches may be neces- <br />sary and would be constructed for efficient <br />drainage of water. All ditches will be sized <br />for appropriate capacities. The mine site <br />disturbed area drainage has also been sized <br />for a 10-year, 2L-hour_torm event. _ <br />The culvert that was constructed below the <br />fill embankment has been designed to safely <br />pass a 100-year, 24-hour event with no inlet <br />head required. It can safely pass a 500-year, <br />24-hour event with a few fee[ of head. Tnis <br />culvert has been designed with appropriate <br />sediment and deb-ris traps so that the integri- <br />ty of the culvert is ensured. Periodic main- <br />tenance will be completed [o ensure the cul- <br />vert is in place. <br />Tne next part of the drainage plan is the sed- <br />imentation pond. The drainage ditches along <br />the northern perimeter of the portal level <br />Added 10/12/86 <br />Revised 01/06/87 <br />Revised 10/01/87 <br />Revised 03/28/88 <br />107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.