Laserfiche WebLink
Page 3 <br />discharge. This area includes the active refuse disposal <br />area, the reclaimed portion of the pile and the slope between <br />the active area and a diversion ditch above the pile. <br />014 - Cameo Borrow Area No. 2 and proposed Cameo Refuse <br />Disposal Area No. 3 (CRDA 3). Runoff from approximately 12.0 <br />acres is currently routed through Pond 11 and runoff from an <br />additional 28.0 acres will be routed through this pond in the <br />future. This area includes a borrow area which is a source of <br />cover material for portions of CRDA 1 and 2. In the future it <br />will also include runoff from CRDA 3 and topsoil stockpiles. <br />015 - Mine discharge from the RSS. This discharge permit is <br />located at the No. 2 West Portals. <br />In addition the areas covered by our industrial waste water <br />discharge permit, there are areas covered by alternate drainage <br />control in our Mining and Reclamation permit with DMG. These areas <br />are listed on table 2.05.3M, Alternate Sediment Control Areas in <br />our Mining and Reclamation permit application. Some of the areas <br />listed on this table such as fuel tank berms and topsoil stockpiles <br />are within the drainage areas of permitted industrial wastewater <br />discharges listed above and are not included in the following list. <br />A listing of the alternate sediment control areas which are subject <br />to this SWMP are as follows: <br />Overland Conveyor - the conveyor from the highway to the UTL <br />rail loop consists of three drainage areas: on the east side <br />of the river where it surfaces after being tunneled under the <br />highway and starts over the river, on the west side of the <br />river from the river crossing to the county road, and from <br />Coal Creek to the rail loop. Two transfer buildings are <br />located along the conveyor route. Approximately 0.5, 6.7 and <br />20.1 acres are within these disturbance areas respectively. <br />Powder and Cap Magazine - this drainage area includes a short <br />light duty road and pad where a small powder and cap magazine <br />are located. The disturbance for this area is approximately <br />0.2 acres. <br />Railroad Embankment Adjacent to the Loadout Structure - A <br />portion of the outslope of the rail loop near the loadout <br />structure was included designed for drainage control due to <br />potential spillage and wind blown dust. This disturbance <br />includes approximately 5.1 acres. <br />No. 2 West Portals - this area includes a small disturbance <br />near the two portals, an overburden stockpile, a substation <br />and the light duty road between them. This disturbance <br />includes approximately 0.9 acres. <br />