PARTI
<br />Page No. 10
<br />Perini[ No. CO-0032115
<br />B. MONITORING REQUIREMENTS
<br />1. Frequency and Sample Tvce
<br />In order to obtain m ibis-!+ro+ of the probable compliance or uonromplisnco with the effluent limitations specified in Pert
<br />I.A.1, tba permittee shall monitor all affhtem parameters at the following frequencies. Stitch monitoring will begin immediately
<br />end lest for the life of the permit unkas otherwise soled. The results of such monitoring shall be reported on the Discharge
<br />Monitoritg Report (Sx Part I.E.1.).
<br />(a) Outfalls 008.010.012.018.022, and 024
<br />Effluent Parameter Measurement Freauencv
<br />Flow, MGD Weekly
<br />Total Suspended Solids, mg/t Mouthy
<br />Total Iron, mg/t Monthly
<br />Settleable Solids, mt/t Monthly
<br />Oil e~ Grease. mg/t Weekly
<br />pH, s.u. Weekly
<br />(b) Outfalls 001. 002. 005.009.011. 013.015. 016. 019. 019. 020. 021. 023
<br />Effluent Parameter
<br />Fbw, MGD
<br />Total Suspended Solids, mg/t
<br />Total Iron, mg/t
<br />Settleable Solids, mP/t
<br />Oil aqd Grease, mg/f
<br />pH, s.u.
<br />Whole Effluent Toxicity, Acute
<br />Outfalls 001, 005, 009, 011, 013, 015, 016,
<br />017, 019, 020, 021, 023
<br />Outfall 002
<br />Messtu~emegt Frequency
<br />Weekly
<br />Monthly
<br />Monthly
<br />Monthly
<br />Weekly
<br />Wxkly
<br />Qttatterly
<br />Semi-pmtnally^
<br />Samnle 7Wce
<br />Ltatantanaoua
<br />or Contimtau
<br />Grab
<br />Grab
<br />Grab
<br />Visual
<br />In-situ
<br />Samole'IWce
<br />Instantaneous
<br />or Continuous
<br />Grab
<br />Grab
<br />Grab
<br />Visual
<br />In-Situ
<br />Grab
<br />Grab
<br />• The permittce shall use fathead minnow as the single species for the fast half of each year and Ceriodaohnis ap. as the single
<br />species for the second half of each year.
<br />(d OutfaLLs 003. 006 snd 014
<br />Effluent Parameter Measurement Frequency Sample Tvce
<br />Flow, MGD Weekly L[stantmaous
<br />or Contintous
<br />Settleable Solids, mE/t Monthly Grab
<br />Oil and Grease. mg!! Weekly Visual
<br />pH, s.u. Weekly Iusitu
<br />Self-monitoring sampling by the permiaee for compliagce with the monitoring ragttirements specified above shall be
<br />performed at the following locations: discharge points 001, 002, 003, 005, 006, 008, 009, 010, 011, 012, 013, 014, 015,
<br />016, 017, 018, 019, 020, 021, 022, 023, end 024, as showy in Figures 2, 3 and 4.
<br />Should a precipitation evwt or snowfall occur, the permittee shall submit proof in order for m exemption to be claimed.
<br />Said proof shall be submitted as m attachment to the Discharge Monitoring Report (DMR) for the appropriate period.
<br />Sce Part I.A.3.
<br />See Part I.C. for Defmitionss.
<br />Amendment No. 1 Issued MAY 30 1997 Effective JUL 1 1997
<br />Amendment No. 3 Issued OCT 26 1998 Effective DEC 1 1998
<br />Amendment No. 4 Issued Effective
<br />
|