Laserfiche WebLink
1 <br />' shown on the attached vicinity map, Exhibit A. The layout of the surface facilities azea is <br />shown on Exhibit SF-I. <br />' This plan addresses the two areas on the proposed facility which are relevant to SPCC <br />requirements. <br />t 1. On Road Equipment - up to 10,000 gallons <br />2. Crushing Operation - up to 10,000 gallons <br />' 3. Wash Plant - up to 10,000 gallons <br />4. Off Road Operational Equipment - up to 10,000 gallons <br />' The fuel is dispensed to a Fleet of trucks, mining equipment or generators to power <br />crushing and screening/washing equipment through the pumps adjacent to the tank. The <br />pumps aze located within the containment vessel. At no time is the fuel sold to outside <br />' parties. The combined capacity of these tanks exceeds the minimum of 1,329 gallons for <br />a facility and each tank individually exceeds the minimum of 660 gallons for any single <br />aboveground tank. Thus, as stated in 40 CFR Part 112.1(d)(2)(ii), the entire facility is <br />' subject to SPCC regulations. <br />The other on-site facility which is used for the storage and handling of petroleum based <br />' products is the vehicle maintenance shop. The shop building (Surface Facilities Area) <br />handles vehicle motor oil, lubricants, hydraulic oil, and used oil in 55-gallon drums and <br />other metal containers with capacities ranging from 5 to 1 l0 gallons each. These <br />' containers are stored indoors on a concrete floor. <br />1.4 Spill Prediction <br />This plan considers two spill scenarios for each of the in-pit fuel tanks: 1) failure of the <br />tanks, and 2) spills which could occur during truck and/or equipment loading or <br />' unloading. Section 2.l addresses these scenarios. <br />This plan considers one spill scenario for the vehicle maintenance shop: 1) a spill <br />' indoors from one of the vehicle fluid containers. Section 2.2 addresses this scenario. <br />1.5 Plan Organization <br />' The remainder of this plan is organized as follows. Section 2.0 discusses each of the two <br />areas individually, including the information required by 40 CFR Part 112.7. Section 3.0 <br />' discusses security measures for the facility, Section 4.0 discusses the personnel training <br />program, and Section 5.0 discusses inspections and records keeping for the facility. <br />' Appendix A includes sample inspection forms. Amendments and updates to the plan will <br />be listed chronologically on the Title page and discussed in Appendix B. <br />1 <br /> <br /> <br />