Laserfiche WebLink
The project demand was divided by the annual consumptive use to determine the acreage <br />that must be dried up to provide the necessary credit. This azea is 54.46 acres. The montlily <br />imgation values aze shown in the following Table 4. <br />Also shown in Table 3 aze portions of the decrees that aze necessary for mining both pits. <br />These amounts were derived by dividing the required dry up azeas by the historically irrigated <br />azea of 80 acres. The azea decreed for dry up for the Seahorse Pond in Case No. 96CW267 was <br />six acres, and the azea proposed for dry up in this plan is 54.46 acres. <br />TABLE 3 <br />GRIFFING NO.1 DITCH DECREES <br />Priority No. Amount, cfs Adjud Date Approp Date Case No. 96CW267 SWSP <br />39 2.00 04/29/1904 01/06/1878 0.150 1.362 <br />44 1.00 04/29/1904 08/01/1879 0.075 0.681 <br />208 8.00 04119!1943 06/01/1878 0.600 5.446 <br />212 4.00 04/19/1943 08/01/1879 0.300 2.723 <br />287 11.00* 04/19/1943 04/29/1904 0.551 5.004 <br />Note: *7.35 cfs of Priority No. 287 is claimed by VCI <br />6 <br />