My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-06-29_PERMIT FILE - M1994103
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1994103
>
1996-06-29_PERMIT FILE - M1994103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 12:28:08 PM
Creation date
11/20/2007 6:01:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994103
IBM Index Class Name
Permit File
Doc Date
6/29/1996
From
COSTILLA CNTY COMMISSIONERS
To
DMG
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. LOADING OUT FROM RAW MATERIAL STOCKPILE: <br /> Method of loading out (front-end loader, conveyor, etc. ) <br /> Loading schedule: tons/hour hours/day days/year <br /> Proposed controls for loading to stockpile: <br /> Controls include: no control, water sprays, total exposure, partial <br /> exposure, moist material, other (specify) <br /> VI. PROCESSING <br /> Will processing (i.e. , crushing, screening, etc. ) occur on site? <br /> ® Yes ❑ No (check one) <br /> NOTE: ALL PROCESS EQUIPMENT REQUIRES A SEPARATE PERMIT APPLICATION AND <br /> APEN (SEPARATE FORM IS ATTACHED AT END OF THS FORM - MAKE ADDITIONAL <br /> COPIES As NEEDED) . <br /> Material loaded into processing equipment by: <br /> Conveyor Front end loader Other <br /> CONTROLS FOR PROCESSING INCLUDE: Moist or wet materials (specify <br /> moisture % if known) , water spray bars, bag filters, other <br /> (specify) , no control. If existing processing equipment will be <br /> relocated from another location complete the following sections. <br /> This equipment must already be permitted. <br /> (LIST PROCESSING CONTROLS IN THE APPROPRIATE SPACES BELOWI <br /> A. PRIMARY CRUSHING <br /> Maximum tons crushed per year tons. <br /> .Maximum tons crushed per hour tons. <br /> Hours of crushing per day hours. <br /> Proposed controls (see above) <br /> B. SCREENING/CLASSIFYING <br /> Maximum tons screened per year tons. <br /> Maximum tons screened per hour tons. <br /> Hours of screening per day hours. <br /> Proposed controls (see above) <br /> C. SECONDARY CRUSHING <br /> Maximum tons crushed per year tons. <br /> Maximum tons crushed per hour tons. <br /> Hours of crushing per day hours. <br /> Proposed controls (see above) <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.