Laserfiche WebLink
V. RAW MATERIAL <br /> A. REMOVAL <br /> OTHER <br /> MATERIAL ROCK COAL <br /> Tons removed per year <br /> Maximum tons removed per day <br /> Equipment used for removal <br /> Equipment capacity (in-tons) <br /> Est. hours per year required for removal <br /> Is material dry, moist, or wet? <br /> Specify moisture content if known ($) <br /> H. LOADING IN TO W MATERIAL STOCKPILE <br /> Method of loading in (tru k bottom dump, front-end loader, etc. ) <br /> Loading schedule: tons/hour hours/day days:/year <br /> Proposed controls for lox ing to stockpile: <br /> Controls include: no control, water sprays, total enclosure:, partial <br /> enclosure, chemical sup ressants, reduced drop height, telescoping <br /> chute, other (specify) _ <br /> C. RAW MATERIAL STOXKPILE <br /> OTHER <br /> MATERIAL ROCK COAL <br /> Maximum tons stored at any one time <br /> Length of time pile remains undisturbed <br /> Proposed controls for raw material stockpile: (check appropriate boxes) <br /> ❑ Watering times/day, or continuous sprinkler (to <br /> maintain moist surface) . <br /> ❑ •Chemical stabilizer (Type: <br /> ❑ Compacting of piles, method <br /> ❑ Enclosures: complete, or partial (check one) <br /> ❑ Other (specify) <br /> ❑ No control <br /> 4 <br />