Laserfiche WebLink
D. RESCREENING CLA SIFYING <br /> Maximum tons screened per year tons. <br /> Maximum tons screened per hour tons. <br /> Hours of rescreening per CLay hours. <br /> Proposed controls (see above) <br /> VII. CONVEYORS TRANSFER POINTS <br /> A. CONVEYORS <br /> Tons of material conveyed per year tons. <br /> Tons of material conveyod per day tons. <br /> Proposed controls <br /> Controls for conveyors in Jude: Full enclosure, partial enclosure, no <br /> control, other (specify) <br /> (INDICATE ON A SEPARATE DIAGRAM HOW CONVEYOR SYSTEM IS SET U11) <br /> H. TRANSFER POINTS <br /> Number of transfer points <br /> Proposed controls <br /> Controls for transfer Doints include: Full enclosure, partial <br /> enclosure, water sprays, chemical suppressants, no controls, other <br /> (specify) <br /> 6 <br />