Laserfiche WebLink
haulage to the plant site for further processing. The smaller-sized material will be <br /> stockpiled for future possible use as concrete sand or will be wasted back into <br /> ' the active mine pond. If the smaller fraction is to be used as concrete sand, a <br /> sandscrew will be employed at this location of the stockpile. <br /> Pumped water from the active mining pond will wash through the sand and <br /> gravel being screened. Any fines from the washed aggregate will be gravity-fed <br /> ' back into the pond. Washed aggregate hauled to the plant site will b <br /> processed by crushing screening and stockoili t-tbe_plantsite. This <br /> aggregate will then either be transported for offsite purposes or inc�_rated_into. <br /> aaasphalt_mix.to behatched onite in the plant area (See Exhibit C). <br /> South Borrow Pit Area <br /> No processing will occur in this area, as excavated material is to be used as fill <br /> only. <br /> I <br /> Equipment Utilized: <br /> On-site mining and processing equipment will include: <br /> Mobile: <br /> ' Bulldozer <br /> ' Scraper <br /> Dragline <br /> ' 14 <br />