Laserfiche WebLink
i <br /> Motor Grader <br /> ' Water truck <br /> Haul Trucks (2, 15 to 35 tons) <br /> Front-end Loaders (2, mining pond and plant) <br /> Portable: <br /> Vibrating screens (primary) <br /> Sandscrew <br /> Gravel Plant (crusher, screens, conveyors) <br /> ' Asphalt Plant <br /> Sequence of Activities on Site: <br /> North Mining Area <br /> ' The following is a listing of the sequence of activities for the proposed mining <br /> project (refer also to Exhibit C): <br /> ' 1. Topsoil/overburden will be stripped and stockpiled from the area designated <br /> ' as the plant site located in the northeast corner of the permit area adjacent to <br /> State Hwy. 194 (See Exhibit C). The existing house and outbuilding will be <br /> ' used as an office and scalehouse. The portable gravel plant (Iricluding <br /> screens, crushers, and stacking conveyor belts) will be erected. The asphalt <br /> plant will be erected near to the gravel plant. The access onto State Hwy.194 <br /> will be installed and developed to the required state standard. The interior <br /> ' haul roads and exterior haul road will be graded and improved. A culvert will <br /> be placed in the seepage/drainage ditch on the east side, and possibly in the <br /> central portion of the permit area, to facilitate hauling of washed aggregate <br /> ' across the ditch to the plant site (See Exhibit C). <br /> ' 15 <br />