<br />Phase One Minin <br />At the present time Ready Mixed Concrete is mining a short <br />' distance to tha south on the Tower Farms property. This <br />particular site is exhausted on the east side of the river. The <br />applicant intends to move its operation to this site. <br /> <br />1 <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br />1 <br /> <br />During the summer, fall, and winter of 1987 the applicant will <br />grade th• plant site area and construct an access road from Old <br />Brighton Roed. The processing plant presently on th• Tower Farms <br />property will be relocated here. There is room reserved for a <br />ready mixed concrete plant but this will be installed later. We <br />would anticipate the concrete batch plant to b• installed within <br />the next 5 years. <br />At this time we will also relocate the McCann Ditch, which <br />involves regrading a slight length of the Third Creek in order to <br />make the area work hydrologically. <br />The next activity will be the excavation of the wash water pond. <br />This •xcavation is called Phase One. This pond will then serve <br />as our recycling source for washing the concrete aggregate. <br />Concurrent with the excavation we will construct the permanent <br />conveyor belt which will serve phases 2 through 6. <br />Prior to the grading of the processing plant site, the topsoil <br />will be stripped and stockpiled along the north and east sides of <br />the plant area. City of Brighton regulations call for a 25' wide <br />landscape buffer. Within this buffer we will create the topsoil <br />berm. Trees and shrubbery will then be planted as a visual <br />screen on top of and adjacent to the topsoil berm. <br />Phase Two Minino <br />The mining will begin in earnest in the spring of 1988. Th• <br />mining will progress from Phase Two to Phase Eight. The topsoil <br />in each 15 acre segment will be stripped and stored in a <br />segregated topsoil. Then the remaining overburden will be <br />stockpiled for backfilling of the pit slope and shoreline. <br />Mining will then begin with the dragline. Material will be <br />excavated and windrowed for several days to drain off excess <br />moisture. A loader will then place the resource on a conveyor <br />belt which will transport it to the processing plant. <br />At the end oP each mining season, the next 36 acres will be <br />stripped of topsoil and overburden. Again these two materials <br />will be segregated and stored. If stockpiles remain Por longer <br />than one year they will be seeded with a grass mixture to prevent <br />erosion. <br />D-2 <br />1 <br />