Laserfiche WebLink
<br />1 <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br />The mining for all the phases will progress in this same general <br />Pashion. The mining plan notes the various setbacks with which <br />we will comply. Most of the cottonwood trees along the South <br />Platte River will be preserved. We are proposing a 100' setback <br />from the east edge of the new South Platte River channel as <br />proposed in the Phase B Master Plan prepared by the Urban <br />Drainage and Flood Control District. If the mining proceeds <br />closer than 400' from the river we will be required to do the <br />river channel improvements. <br />According to our agreement with the McCann Ditch Company, the <br />lake resulting from the mining will be segmented into three <br />sections. The water elevation in the upper two lakes will be <br />controlled by overflow pipes. In this way we can stabilize the <br />groundwater table and the lake elevation at approximately the <br />same level and thus not affect the McCann Ditch. <br />The location of these dikes has also been coordinated with an <br />existing natural gas line owned by the Coors Energy Company. <br />Section BB on the plan shows the typical dike excavation for <br />those portions of the dike which do not contain the gas line. <br />Esentially we will be excavating a trench where the dike is to be <br />located and then backfilling this trench with overburden. We <br />will then excavate the gravel resource on each side of the <br />backfilled trench. The proper 3:1 slopes will be constructed. <br />Section AA shows the dike where it does contain a gas line. <br />Included at the end of this section is a response from the Caors <br />Energy Company regarding the terms of the •asament for the gas <br />line. <br />Table of Disturbance <br />Size of Areas to be worked at any one time. <br />' 1. Mayor Disturbance <br />Land stripped of topsoil <br />' 2. Moderate Disturbance <br />Shore at mined area <br />Plant site <br />Other (roads, stockpiles, etc.) <br />' 3. Minor Disturbance <br />Shore undergoing reclamation <br /> <br /> <br /> <br />D-3 <br />15.0 acres <br />2.0 acres <br />12.0 acres <br />2.0 acres <br />2.0 acres <br /> <br />