Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task <br />_____ No.~ <br />___I______,.__ Task Description <br />_________________..______.,_________ ~ Cost (E) <br />____~__I___,.________ <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.~ Task Description <br />Subtotal (L ): <br />Lost (E) <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task <br />_____ No.l <br />______________ Task Description ~ <br />________.,______.,______..______..______~__I _ Lost (E) <br />___________ <br />10a ~ Demolitioroispose of 10'x10'x20' mass a 80.23/c.f~ E460 <br />11a ~ Seeding As per attached worksheet ~ E16,360 <br />12a ~ Fencing 5000' Of 3 wire fence iJ E3.50/ft ~ 517,500 <br />13a ~ Mob/Demob As per attached worksheet ~ E1,407 <br />Subtotal (M ): E35, 727 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): E107,451 <br />[I. INDIRECT COSTS <br />_______________________________________________________________ ________ <br />________________________________________________________________________ <br />A. CONTRACTOR'S OVERHEAD & PROFIT <br />Item No.~ Item Description ~ Cost (E) <br />________I__________________________________________________I____________ <br />1. ~ Public Liability Insurance.... 1.SSOX of dir. ~ E1, 665 <br />2. ~ Contractor's Performance Bond 1.5507. of dir. ~ 51,665 <br />3. ~ Contractor's Profit........... 10.OOX of dir. ~ E10, 745 <br />4. ~ Job Superintendent.. <br />Subtotal (A): E14,076 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): E121,527 <br />B. OMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Cos[ (E) <br />_,.______I__________________________________________________I____________ <br />1. ~ Minerals Program Admin. Fee at 5.00% of cntr.~ E6, 076 <br />NET INDIRECT COST PERCENTAGE: 18.76X Subtotal (B ): E6,076 <br />TOTAL INDIRECT RECLAMATION CASTS (subtotals A through B): 520,152 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): E127,604 <br />