Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHYORK - STREAM CHANNEL RECONSTRUCTION <br />Task No,l Task Description ~ Cost (E) <br />_______..I ______.._______.._______.,_______.,_______.,_______~___ I ___..________ <br />Subtotal (H ): <br />____ ______ <br />I. EARTHNORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No,~ Task Description ~ Cost (E) <br />________I__________________________________________________I___________.. <br />Sa ~ Excavate trapezoidal outlet structure, ~ E517 <br />6a ~ Purchase 1540 c.y. of 2' diameter riprap u(local ~ E30,814 <br />delivery included a E20.00/c.y- <br />7a ~ Use excavator to place ri prep on outlet structure E1, 065 <br />Subtotal (1 ): E32,396 <br />J. EARTHNORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (E) <br />8a ~ Replace an average of 7" depth of topsoil on ~ E479 <br />perimeter of Phase V area. <br />9a ~ Replace an average of 7" depth of topsoil on ~ E2,998 <br />Phase IX area. <br />Subtotal (J): E3,477 <br />