My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE58183
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE58183
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:00:29 PM
Creation date
11/20/2007 5:45:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999025
IBM Index Class Name
Permit File
Doc Date
6/25/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHYORK - STREAM CHANNEL RECONSTRUCTION <br />Task No,l Task Description ~ Cost (E) <br />_______..I ______.._______.._______.,_______.,_______.,_______~___ I ___..________ <br />Subtotal (H ): <br />____ ______ <br />I. EARTHNORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No,~ Task Description ~ Cost (E) <br />________I__________________________________________________I___________.. <br />Sa ~ Excavate trapezoidal outlet structure, ~ E517 <br />6a ~ Purchase 1540 c.y. of 2' diameter riprap u(local ~ E30,814 <br />delivery included a E20.00/c.y- <br />7a ~ Use excavator to place ri prep on outlet structure E1, 065 <br />Subtotal (1 ): E32,396 <br />J. EARTHNORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (E) <br />8a ~ Replace an average of 7" depth of topsoil on ~ E479 <br />perimeter of Phase V area. <br />9a ~ Replace an average of 7" depth of topsoil on ~ E2,998 <br />Phase IX area. <br />Subtotal (J): E3,477 <br />
The URL can be used to link to this page
Your browser does not support the video tag.