Laserfiche WebLink
~I R C E S Cost Estimating Software <br />EARTHNORK FORM - SCRAPER-ONLY NORK <br />____________________________________ <br />____________________________________ <br />Agency or organization name DMG <br />Task # 02a State Colorado Permit # M-99-025 <br />Date 06/21/99 County Mesa Abbr. none <br />User SSS Site Soaring Eagle GraveFiLename M025-02a <br />Permit/job action New 112C Application <br />Task description Backfill material to create wetland <br />HOURLY EOUI PMENT COST <br />_____________________ Model Cat 633E Shift basis t/day <br />Cost Breakdown _____________________________ -_____-__. <br />-------------- Utilization X Horsepower 475 <br />Ownership cost/hour 567.68 NA --------- <br />Operating cost/hour 8105.27 100 Height (UST): 56.00 <br />Operator cost/hour E23.3D NA --------- <br />___-____- (CRG) <br />Total unit cos[/hour: 8196.26 Total fleet cost/hr: 5196.26 <br />MATERIAL QUANTITIES <br />___________________ <br />___________________ <br />Initial Swell Loose <br />volume : 14,444 LCY factor NA volume 14,444 LCY <br />Source of quantity rake-off :Assure 650' x 60' x 10' wetland <br />Source of est. swell factor NA <br />HOURLY PRODUCTION <br />_________________ Hauling Capacity (weight vs. volume basis) <br />__ <br />__ <br />_ <br />Material type 8 wt. ___ <br />____ <br />____ <br />2,400 lbs/LCY ~ Struck volume NA LCY <br />Clay 8 gravel - Dry ~ Heaped volume 34.00 LCY <br />--------------------------------------- ~ Average volume 34.00 LCY <br />Rated payload 82,000 lbs. ~ ------ ------- <br />Payload capacity 34.17 LCY ~ Adjusted volume 34.00 LCY +++ <br />Cycle Time Loading•••-•-•••-• ••••••••••.•••••••: 0.90 min. <br />---------- Maneuver 8 spread . ..................: 0.70 min. <br /> + load time/pair on push-pull models ------ ------- <br />Travel: Distance(ft) Grade Y. R. Res.X Total R.% Vel.(fpm) <br />Haut 1,600 0.0 5.0 5.0 1,243 1.40 min. ++ <br />Return: 1,600 0.0 5.0 5.0 2,124 1.01 min. •+ <br />+* adj. for acceleration/deceleration Total cycle time 4.02 min. <br />Job Condition Correction Factors ------ ------- <br />Site altitude (f t) 4,490 Adjusted Hourly Production <br />Altitude adjustment 1.00 (CAT NB) -------------------------- <br />Job efficiency fct r.: 0.83 (1 s/d) Unadj. unit prod. 508.05 LCY/Hr+++ <br /> --------- Adj. unit prod. 421.68 LCY/Hr <br />Net job correction 0.83 Adj. flees prod. 421.68 LCY/Hr <br /> --------- *+• 2x vol. on p-p's ______ _______ <br />JOB COST Fleet size 1 Scraper(s) Total job time 34.25 Hours <br />Unit cost E0.465- /LCY Total job cost - 56,723- <br />