Laserfiche WebLink
Table 5-1. Traooer Mine Toasoil Pile Inventory (1) <br /> Topsoil Coordinates Size Approximate Year <br /> Pile ID Location Northing Easting (acres) CYDS Created <br /> A76-4 GB well site 410,070 1,417,400 0.5 7,805 pre 1976 <br /> A77-1 Afield coal pile 409,850 1,411,300 1.3 10,620 1977 <br /> A88-1 North A Haul Road W of REA Line S 405,450 1,425,100 1.7 60,480 1988 <br /> *A91-8 NW Edge of H Pit Reclamation 410,800 1,421,400 5.1 67,159 1991 <br /> *A92-1 North A Road East of East Pyeatt 411,900 1,427,900 12.5 336,429 1992 <br /> A92-2 Middle Pyeatt Regrade Spoils 409,800 1,426,000 6.0 179,676 1992 <br /> A92-3 North A Road East of West Pyeatt 412,100 1,424,400 0.6 7,632 1992 <br /> A93-1 A pit South #1 406,550 1,426,040 3.9 86,454 1993 <br /> A94-2 E of Grouse Drainage 412,000 1,429,300 4.4 105,122 1994 <br /> A94-4 S of A pit cut 406,500 1,429,600 3.9 108,948 1994 <br /> A95-2 Oak Pond 410,400 1,433,030 1.1 13,548 1995 <br /> A96-1 Mid A Spoil Road 409,800 1,429,450 2.1 52,612 1996 <br /> A96-2 NorthAPitwestofA95-2 411,100 1,432,100 3.0 27,812 1996 <br /> A97-1 South A Pit east side of F4 Road 405,460 1,430,250 2.6 57,172 1997 <br /> A97-2 South of LOM Road 408,150 1,429,200 1.5 87,920 1997 <br /> A97-3 North end 97A-T/S Laydown 411,200 1,430,230 0.5 15,484 1997 <br /> A98-1 F3 and F4 Road Intersection 407,070 1,430,520 2.6 45,248 1998 <br /> A98-2 Middle A Road North Side 409,300 1,430,730 2.9 80,332 1998 <br /> A98-3 West Middle Flume Pond #3 407,500 1,438,240 5.3 193,928 1998 <br /> A99-3 East Middle Flume Pond 407,630 1,437,275 0.8 9,000 1999 <br /> A01-1 South ofAET-1 405,800 1,440,660 4.1 77,868 2001 <br /> AET-1 East of East A Pit 406,680 1,440,770 5.0 168,196 2000 <br /> ASH1 Johnson Gulch East Tributary 408,000 1,421,200 3.9 97,092 1992 <br />. ASH2 Johnson Gulch East Tributary 408,200 1,422,000 1.3 27,486 1992 <br /> BUZ92-1 Far East Buzzard Pond #1 411,100 1,410,250 0.4 882 1992 <br /> CG1 Coyote Gulch 411,050 1,412,200 4.8 18,309 1978 <br /> D93-1 North D pit#1 407,725 1,418,160 0.5 20,570 1993 <br /> D97-1 North end Enfield Pit 405,640 1,419,440 1.8 37,576 1997 <br /> E78-1 E pit SE pile small 402,490 1,422,730 0.7 10,000 1978 <br /> E78-2 Middle E pit pile 404,400 1,423,100 4.5 25,238 1978 <br /> E79-4 E pit SE pile large 401,900 1,422,650 2.8 34,010 pre 1979 <br /> E79-6 Castor Gulch road E pit pile 401,200 1,420,950 9.0 208,968 pre 1979 <br /> E87-12 E pit regrade pile 403,850 1,422,350 4.1 73,278 1987 <br /> E89-11 E pit Ute Gulch 402,100 1,420,100 0.2 1,100 1989 <br /> E93-4 North E pit#4 408,750 1,421,050 0.9 14,030 1993 <br /> E93-5 Middle E pit#5 403,955 1,419,950 0.8 7,130 1993 <br /> E94-1 W of D East Road 404,280 1,420,370 0.3 2,304 1994 <br /> E94-2 N of D East Road 407,270 1,418,750 0.2 1,200 1994 <br /> EFL East Flume Pond 407,740 1,440,350 0.7 6,076 2000 <br /> EM1 E. of Explosive Magazine 411,330 1,414,300 0.4 5,456 1980 <br /> EP2 East Pyeatt Dam #1 East 412,150 1,426,900 0.3 3,700 1988 <br /> EP3 East Pyeatt Dam #2 West 413,100 1,426,380 0.6 7,500 1988 <br /> EP4 East Pyeatt Dam #2 East 413,200 1,426,750 0.4 4,500 1988 <br /> F95-1 West Edge of F Pit 403,500 1,426,200 3.7 89,278 1995 <br /> F95-2 F-Pit north of F95-1 405,300 1,426,400 7.2 154,574 1995 <br /> F96-1 North End of Ash Dump 408,311 1,428,096 1.7 22,120 1996 <br /> F96-2 Between Piles F95-1 and F95-2 404,200 1,426,200 2.2 46,032 1996 <br /> F97-1 South of A97-1 approx. 1,700 ft 403,790 1,430,700 3.0 82,852 1997 <br /> FWF97-1 West Flume Pond 409,360 1,435,920 0.6 4,705 1997 <br />