Laserfiche WebLink
Table 5-1. Cont. - uaue 2 <br /> <br />Topsoil Coordinates Size Approximate <br />Pile ID Location Northing Easting (acres) CYDS <br />G1-03 EastG-Pit 406,526 1,438,555 3.5 100,828 <br />G2-03 South G-Pit 402,294 1,437,702 1.5 23,184 <br />G1-02 East Edge of G Pit 403,670 1,440,337 7.4 213,612 <br />G2-02 East Edge of G Pit 404,433 1,440,265 1.9 18,144 <br />G4-02 North A-E R LOM Roads Intersection 406,728 1,436,968 2.1 137,784 <br />G1-01 North of LOM rd @ G Pit 407,740 1,434,270 4.0 105,532 <br />GP-1 Grouse Pond 412,925 1,429,530 0.9 13,212 <br />H04 West Horse Pond 401,580 1,430,260 0.7 6,244 <br />H93-2 H pit North #2 412,720 1,422,940 3.3 67,078 <br />H93-3 South H pit#3 406,940 1,424,040 5.2 82,228 <br />HRS Horse Pond 403,090 1,432,930 1.0 22,485 <br />JG1 Johnson Gulch Dam #7A 411,700 1,419,700 1.6 25,116 <br />JG2 Johnson Gulch Dam #8 412,500 1,420,150 1.2 15,458 <br />JG3 Johnson Gulch Dam #9 413,100 1,420,300 1.4 14,269 <br />JG4 Johnson Gulch Dam #10 414,250 1,419,950 1.7 25,777 <br />JG5 Johnson Gulch Elect Station 414,250 1,419,450 0.5 6,209 <br />JG6 North A Haul Road Johnson 413,000 1,420,950 1.2 13,212 <br />JG7 North A Haul Road Ag Field W 412,400 1,422,250 0.5 16,850 <br />JG8 North A Haul Road Ag Field E 412,300 1,422,700 0.7 12,840 <br />LG1 Low grade coal topsoil pile 406,800 1,418,500 3.7 46,220 <br />MH1 Main haul road north 411,710 1,418,660 1.0 27,334 <br />MH2 Main haul road south 410,800 1,418,550 1.2 35,216 <br />MP1 Middle Pyeatt Dam #1 412,200 1,425,030 0.6 4,200 <br />MP2 Middle Pyeatt Dam #2 413,000 1,425,220 1.2 12,500 <br />MP7 Middle Pyeatt Sediment Basin 411,000 1,425,400 0.2 645 <br />NN1 No Name Dam #4 412,900 1,415,640 1.0 10,372 <br />SC3 S curve east of (haul road runaway) 407,400 1,417,860 1.2 11,477 <br />SP5-94 SW of Sage Pond 412,600 1,430,555 0.6 6,318 <br />SP6-94 SE of Sage Pond 412,700 1,431,200 0.7 12,204 <br />SY1 Shop yard pullout expansion 413,660 1,419,250 0.2 900 <br />WC1 Wye coal pile site 412,600 1,417,500 2.6 53,197 <br />WP2 West Pyeatt Dam #1 413,200 1,424,190 1.2 10,404 <br />WP3 West Pyeatt Pond #2 412,440 1,424,180 1.3 11,322 <br />ZTS-1 East of A97-1 Pile 405,440 1,430,900 6.5 133,476 <br />ZTS-3 Head of Horse Gulch 404,340 1,433,240 4.5 152,684 <br />ZTS-4 West Edge of Z-pit 404,460 1,431,110 1.2 12,500 <br /> Totals 197.6 4,266,442 <br />Year <br /> <br />2003 <br />2002 <br />2002 <br />2002 <br />2001 <br />1993 <br />2004 <br />1993 <br />1993 <br />2000 <br />1980 <br />1986 <br />1986 <br />1987 <br />1989 <br />1987 <br />1988 <br />1988 <br />1985 <br />1986 <br />1982 <br />1986 <br />1986 <br />1991 <br />1980 <br />1989 <br />1994 <br />1994 <br />1990 <br />1978 <br />1991 <br />1992 <br />2000 <br />2001 <br />2001 <br />In accordance with MR-155, all of piles A86-6 (depleted in 2004), A92-4 and A92-5 were abandoned <br />and A91-8 and A92-1 were partially abandoned. <br />(1) As of December 31, 2004 <br />BON 3/05 <br />[04T&ab5-1] <br />i~ <br />