Laserfiche WebLink
Mine Area Seneca II • <br />Project Lower 4adge <br />Task _ Grade Lower 4adge Area <br />40RKSHEET N0. L4.1 <br />PRODUCTIVITY FOR DOZER USE - GRADfNG <br />Dozing Activity: Grade Lower 4adge area to drain <br />Dozer Used: D-11N, U Blade <br />Description of Dozing: 250' push <br />Volume: 160.000 bcy <br />200.000 lcy <br />Productivity Calculations: <br />Operator: 75 <br />Grade: see EMF <br />Material Factor: see ENF <br />Push Distance: See EMF <br />Dozing Factor: see EMF <br />Visibility: 90 <br />Altitude: 91 <br />Dual Tilt: 105 <br />Spoil Pile Factor: see EMF <br />Minutes 4orked per Hour: 50 <br />Bank Material Density: see EMF <br />Loose Material Density: see ENF <br />Direct Drive Trans: 100 <br />Total Adj. Factor: 0.5776 <br />Cos[ per Hour = 5798.94 <br />Total Cost = 297 hrs. x 5198.94 cost/hr = 559.085 <br />REFERENCES: <br />Table 13-2-3 <br />Attachment 13-2 <br />EMF 4orksheets <br />Attachment 13-6 <br /> <br /> <br />