Laserfiche WebLink
• Prolec[ Joe Lake Fill <br />Task Grade Fill Into <br />Surrounding Area <br />VORKSHEET NO- JL-1 <br />PRODUCTIVITY FOR D02ER USE - GRADING <br />Dozing Activity: Grade fill into surrounding area <br />Dozer Used: D-11N, U Blade <br />Description of Dozing: 200' push <br />Volume: 80.000 bcy <br />105.600 lcy <br />Productivity Calculations: <br />Operator: 75 <br />Grade: see ENf <br />• Material Factor: see EMF <br />Push Distance: see EMF <br />Dozing Factor: see EMF <br />Visibility: 90 <br />Altitude: 91 <br />Dual Tilt: 105 <br />Spoil Pile Factor: see EMF <br />Minutes 4orked per Hour: 50 <br />Bank Material Density: see EMF <br />Loose Material Density: see EMF <br />Direct Drive Trans: 100 <br />Total Adj. Factor: 0.2623 <br />Cost per Hour = 5198.94 <br />Total Cos[ = 268 hrs. x 5198.94 cost/hr = 553.315 <br />REFERENCES: <br />cable 13-2-3 <br />Attachment 13-2 <br />EMF Worksheets <br />Attachment 13-6 <br /> <br />