Laserfiche WebLink
Mine Area Seneca 11 <br />Project Cow Camp <br />Task Grade Cow Camp Area <br />WORKSHEET N0. CC-1 <br />PRODUCT iVI7Y fOR DOZER USE - GRADING <br />Dozing Activity: Grade Cow Camp (Auger Area E) to drain <br />Dozer Used: D-11N, U Blede <br />Description of Dozing: 200' push <br />Volume: 202.500 bcy <br />245.000 lcy <br />Productivity Calculations: <br /> Operator: 75 <br /> Grade: see EMF <br /> Material Factor: see EMF <br /> Push Distance: see EMF <br /> Dozing factor: see EMF <br /> Visibility: 90 <br /> Altitude: 91 <br /> Dual Tilt: 105 <br /> Spoil Pile Factor: see EMF <br /> Minutes Worked per Hour: 50 <br /> Bank Material Density: see EMF <br /> Loose Material Density: see EMF <br /> Direct Drive Trans: 100 <br />Total Adj. Factor: 0,5251 <br />Cost per Hour = 5198.94 <br />Total Cost = 328 hrs. x 5198.94 cost/hr = 565,252 <br />REFERENCES: <br />Table 13-2-3 <br />Attachment 13-2 <br />EMF Worksheets <br />Attachment 13-6 <br />L <br />