Laserfiche WebLink
<br />will be installed along all permit lines that may receive <br />drainage. A 15' undisturbed area inside of permit will be <br />left, see exhibit "E - 2" <br />Exhibit "C" <br />Page 3 <br />m) Deposits of gravel will be processed on site by crushing <br />or washing rock. See exhibit "E - 2" for location. <br />No chemicals utilized in either method. <br />n) The primary commodities to be mined are sand and gravel, <br />no secondary commodities are expected. Use of final <br />products will be in all different forms of construction. <br />o) Not applicable. <br />J <br />