Laserfiche WebLink
<br />3B Enterprises <br />Deakins Pit <br />Exhibit "D" <br />RECLAMATION PLAN <br /> <br />July 21, 2001 <br />a) When gravel is removed to desirable level with 3:1 <br />back slopes, 6" - 8" of topsoil will be replaced on slopes <br />and disced to break up any packed down soil, seed will <br />then be drilled into soil and then harrowed for a natural <br />smoothness. <br />b) All back slopes of ponds upon reclamation will be graded <br />not steeper than 3:1. <br />c) Reclamation for each phase of the mining proccess will <br />take place within 12 months of abandonment of proposed <br />pits Phase I pit expected to take 3 years +/- to mine out <br />and will be reclaimed within 12 months of the <br />abandonment of said pit and the opening of phase II, after <br />the reclamation of each phase the seed bed will then be <br />disced, drilled and harrowed as mentioned above. <br />Recomended grass seed per: soil conservation office <br />1) Sainfoin - 2.5 lbs. /acre <br />2) Brome Smooth - 1.63 lbs. /acre <br />3) Intermediate Wheatgrass - 2.5 lbs. /acre <br />4) Pubscent Wheatgrass - 2.25 lbs. /acre <br />5) orchard - 0.30 Ibs /acre <br />