Laserfiche WebLink
I William P. Balaz Jr., P. E., have inspected the above Coal Canyon Permanent Diversion <br />and I hereby certify that to the best of my knowledge and belief, the diversion transition <br />structures and channel have been constructed in accordance with applicable performance <br />standards and design criteria. <br /> <br />Y <br />