Laserfiche WebLink
~..:. ~. <br />g. A phone line on the south side of Hwy 194. <br />~,,iC e~'p~' -~- <br />~~~<;r~j"~,..~~ ` ~) h. [Pthe drain ditch between Phases 4 and d is in an easement or right-of--way, name <br />rev~F the owner of that easement or right-of-way. <br />„~,~ There is a map symbol for a depression in the borrow pit phase. It is assumed that this <br />jai a~ Y~f area is part or all of the 12 acre previously disturbed area. Either label this area on the <br />o ( map or show the symbol in the legend. <br />Exhibit D - Mining Plan <br />RRb~~ fp ~{Ll. The mining plan states that "the excavation will be performed in the naturally occurring <br />growtdwater table with no de-watering of the pit area." A copy of the Substitute Supply <br />Plan filed with the State Engineer's office is included with the application. That plan <br />indicates that de-watering will occur. Please explain this apparent discrepancy. Will <br />excavation actually take place below the water table using a dragline as indicated in this <br />application or will the pit be de-watered? <br />~~a~~„f~ Blt 2. Your application as presently written includes mining through the area of a drain ditch at <br />the boundary between Phase 4 and 5. Ed Kite, Manager of Al] Rite Paving and Redi- <br />Mix and Robert B. Laird of Banks and Gesso, LLC have stated to the Division that <br />mining disturbances will not encroach closer than 200 feet either side of the ditch. <br />Please provide the necessary changes to your application. <br />e5 CRS Q~ ;. What is the nature of the stratum inunediately beneath the material to be mined? Rule <br />12 ~ 6.4,4(f)(ii). <br />~ ,~~,q q Y~S~ Your application includes the operation of an asphalt batch plant. Provide your plans for <br />+0 6G~~ containing and disposing of spills of Petro chemical products. If fueling operations and <br />µ~e ~~ other equipment uses of Petro chemicals are anticipated in the permit area, provide spill <br />i~'' ~ ~~ IN ~ t~ containment and disposal plans for spills of such products. Spill containment facilities <br />pia ~°'Y, 4 should have the capacity to contain 12~% of the volume of the lazgest storage tank that <br />~~ could spill to that facility, <br />Exhibit E -Reclamation Plan <br />~Q$~~5~ ~Cl salvaged and stoe kpil d fororepllamatione tThere, is aehightwaterl table and saltytsobls in <br />the permit area. The Rules state that topsoil and overburden should be salvaged and <br />stockpiled separately. Provide your plan for salvaging, stockpiling and usino in <br />reclamation the best 13 inches of topsoil or other growth medium available for <br />IC,`~ reclamation of the lake bank slopes. <br />ne4 (/t^s B ~ ?. In one place }'our application states that 18 inches is the maximum depth of topsoil <br />F ~ replacement. In another it states that 12 inches is the minimum topsoil replacement <br />A11oss1jrcN199005 Adequacy.doc <br />