Laserfiche WebLink
<br /> <br />depth. The Division assumes, for bond calculation purposes, that the averaee depth o.f -. <br />topsoil replacement will be about l~ inches. _ _ <br />~. The final land use for the area to be mined noah of the river is wildlife habitat, with , <br />C Ce most of it being a 142 acre lake. Demonstrate that you will legally be able to expose the <br />„1~ eV~~ eround water to evaporation loss. Provide evidence that a sravel pit well permit or other <br />4VpV necessary approvals have been or will be granted by the State Engineers Office pnor [o <br />tmp(ementation of the mining and reclamation plans. If this can not be done, provide an <br />alternative reclamation plan if possible. <br />CSC ®K-4. In accordance with Rule 6.4.5(2)(b) provide a comparison of the proposed post-minins <br />~e5~ land use to other land uses in the vicinity and to adopted state and local land ttse plans <br />and programs. <br />Exhibit J - Vegetation Information <br />1. Your information states that "there are no fully defined wetlands within the proposed <br />y(~ ~.(d,,,,isturbance areas for the project." When the Division completed the pre-operation <br />S\~ r ~ ~ • inspection it was noted that the Phase 1 area appeared to have lands that could qualify as <br />~~'9 ~ ~O~t~~isdictional wetlands. [Provide astatement from the C.O.E. showing their <br />~~ 6~ A cS~p~determinatton regarding the existence of wetlands in the permit area and what the Corps <br />1'~~ L L`s ~b~{ will require of the operator in regard to your proposed mining and reclamation plans <br />v ~ <br />Exhibit L -Reclamation Costs <br />The Division will review the reclamation costs of your application when the changes to <br />the mining and reclamation plans that you have stated will be submitted are available for <br />review. <br />Exhibit S -Permanent Man-Made Structures <br />Provide the distance of set back from all permanent man-made structures shown on the <br />pre-mining and mining plan map and the list of structures in this review E:chibit C, 3 a-}t. <br />Provide a notarized agreement between the applicant and the persons having an interest <br />in the structures listed in your Exhibit S, that the applicant is to provide compensation <br />for any damage to the structures. Or, provide an appropriate engineering evaluation that <br />demonstrates that such structures shall not be damaged by activities occurring at the <br />mining operation. Also, using one of these altemative methods, provide the necessary <br />documentation for any other listed structure within 200 feet of affected land that your <br />operation will adversely affect the stability of. <br /> <br />,,\1:\oss\jrcU199005 Adcquacy,doc <br />