Laserfiche WebLink
r <br />r i <br />Date: April 12, 1,999 <br />To: Paul Gesso and Robert Laird <br />From: Larry Oehler, Environmental Protection Specialist <br />Rc: File No. M-99-005, All Rite Paving and Redi-14tix, North River Pit <br />Adequacy Ttems <br />The following items must be addressed by the applicant in order to satisfy the applicable <br />requirements of C.R.S. 34-32.~-101 et seg, and the Construction Materials Rules and <br />Regulations of the Mined Land Reclamation Board: <br />General Requirements <br />wil f j~OVr'° 1. Show on the Pre Mining and Mining Plan Map and the Reclamat{on Plan Map the name <br />r of the applicant. Rule 6.2,1(2)(a) /{ ~smei.r J-e pe,~' <br />\v~~~~ The preparer of the maps, in 1 above, must sign them. Rule 6.2. ] (2)(b). <br />Ste a rr2 <br />Exhibit C - Pre Minine and Minins Plan Mao of Affected Land <br />dQeSf':~Y~ O~CI. You show a power/telephone line along Hwy 194. This povverline is within 200 feet of <br />affected land. In accordance with Rule 6.4.3(b), provide the name of the owner of the <br />line(s). Are there other utilities along the highway right-of-way? <br />2. During the pre operation inspection several permanent man made structures within 200 <br />feet of affected land were noted that are either not shown on the map or the owners name <br />does not appear on the-map:.Tltese are listed below and should be shown on the map in <br />accordance with Rule 6.4.3(g)~~ <br />~, <br />/~ An irrigation water control structure (divider box) on the west side of Phase 4. <br />b. A power line at the S~,V comer of Phase 4 servicing a well on the south edge of <br />ee Phase 4. <br />~~ ~ t tdt c. Pond, embankments, fences, etc. belonging to the North La Junta Sanitation <br />y~6~ f~a-yr'/`-~ District. <br />t ~ _ ~/ <br />oy, y~vllP~ ~ <br />t,,,r ~ ~ `- d. A small diameter over flow/drain pipe between the North La Junta Sanitation o~ . <br />p (a <br />District property and the Arkansas River, near the boundary >1 [veep Phases 1 <br />j ~, ) <br />~ and 2. - - ---~ ,~ <br />i -- <br />e. A dike at or near the boundary between Phase 2 and the riparian area. <br />i <br />t: Two wells and a power line near the west boundary of Phase ~. The power line <br />crosses Hwy 194 at the northwest comer of Phase 5. <br />hf\oss\jrc\h19900i Adequacy doe <br />