Laserfiche WebLink
• Revision to Section 2.05.4(b) <br />HAYDEN GULCH LOADOUT <br />Building Removal @ .22/cu.ft. <br />Change House <br />Truck Dump <br />Crusher <br />Hopper, etc. <br />Conical Storage <br />Dim <br />30' x 150' x 10' <br />40' x 40' x 10' <br />50' x 35' x 10' <br />50' x 40' x 60' <br />(5)2 x 30' <br />Cu. Ft. <br />45,000 <br />16,000 <br />17,500 <br />120,000 <br />2,356 <br />Cost <br />$ 9,900 <br />3,520 <br />3,850 <br />26,400 <br />518 <br />$44,188 <br />Conveyor System = 350' @ .857/ft./hr x $29/hr <br />• Excavation Of Structures <br />Backhoe - Cat 215 - No haul distance <br />30" Bucket = 0.75 yd3 cap <br />Cycle time = 20 sec. <br />Prod. = 112.5 yd3 per 50 min. hour <br />Total Excavation = 8,300 yd3 <br />Time Required = 74 Equipment hours <br />74 hours @ $67.70 = $5,010 <br />Concrete Removal <br />455 yd x $85/yd3 = <br /> <br />$38,675 <br />TOTAL <br />11,844 <br />$56,032 <br />751/70/24 Revised January 1985 <br />