Laserfiche WebLink
. Revision to Section 2.05.4(b) <br />MINE SUMMARY <br />Facilities Removal <br />Backfill Pit <br />Eliminate Temporary 0.6. Stockpile <br />Reduce Pit Slopes <br />Topsoil Redistribution <br />Revegetation <br />lOq Administration Cost <br />TOTAL MINE COSTS <br /> <br />n <br /> <br />49,178 <br />548,156 <br />226,177 <br />60,638 <br />382,316 <br />135,129 <br />140,159 <br />1,541,753 <br />751/70/23 Revised January 1985 <br />