Laserfiche WebLink
<br />SBHIBIT 19 <br />BONDING SCSEDIILH <br />FAN BAFFLE <br />ffit 5y <br />• <br />1) Baffle Demolition <br />A. Tear down of structure <br />Crane 4 hours ® $125/hr $500 <br />Labor 4 hours ® $ 20/hr $ 80 <br />B. Haulage to scrap yard $150 <br />2) Foundation Removal <br />A. Concrete footing <br />50 aq.ft. ® $2.90/aq.ft. $145 <br />3) Grading and Seeding <br />A. Currently included is existing bond ,~ <br />1"OT~I. $875 <br /> <br />