Laserfiche WebLink
~.. <br /> <br />S7D3I8IT 19 <br />BOND CALCOLATIOR5 <br />RAIL LOADOIIT <br />14L 55 <br /> <br />1) Silo Demolition and Removal <br />A. This item is currently included is the bonding <br />calculations for the facility area. <br />2) Footings <br />A. 4 ® 3'x3' r8 $18.20/lf $Z7E.40 <br />3) Conveyer Belt Removal <br />A. Steel Framing and Seitiag <br />200' ® $20.00/ft $4000.00 <br />4) 8ackfiliing. Grading, and Revegetatioa <br />(Surlace previously dipturbed and bonded) O.m <br />TOTAL $4218.40 <br />U <br />