Laserfiche WebLink
<br />EXHIBIT 19 <br />BONDING SCHEDULE <br />MR 50 <br />~J <br />Belt Freeze-proofing Tank <br />1. Tank removal <br />Portable tank; cost to haul to disposal <br />facility <br />2. Grading and Seeding <br />Currently bonded in mine area bond- no <br />increase in acreage <br />TOTAL <br />;500.00 <br />0.00 <br />;500.00 <br />• <br />