My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE56263
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE56263
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:58:52 PM
Creation date
11/20/2007 4:59:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
NH1 TAB 13 ATTACHMENT C SEDIMENTATION POND 002
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 7 <br />Spillway Data Summary <br />Sediment Pond 002 <br />Principal Spillway: Type Riser Inlet (CMP) <br />Orifice Diameter 0.5-inch <br />Inlet Elevation. 5697.0 <br />10-year, 24-hour Peak <br />Stage. 5699.44 <br />Emergency Spillway: Type Drop Inlet (CMP) <br />Barrel Diameter 12.000-inch <br />Riser Diameter 12.000-inch <br />Length of Barrel 75.000-ft <br />Vertical Head Drop 5.5-f t. <br />Entrance Loss Coef. 1.000 <br />Bend Loss Coef. 0.500 <br />Wier Coef. 3.100 <br />Orifice Coef. 0.600 <br />Manning Coef. 0.025 <br />Inlet Elevation. 5700.10 <br />25-year, 24-hour Peak <br />Stage. 5700.03 <br />The entrance to the emergency spillway is located more than three (3) <br />feet above the principal spillway. There will be no flow through the <br />• emergency spillway inlet as a result of the runoff from a 10-year, <br />24-hour precipitation event or less. The peak stage of the 25-year, <br />24-hour storm event (Elev. 5700.03) is approximately at the inlet <br />elevation (5700.10) of the emergency spillway. The emergency spillway <br />is capable of passing the runoff from the 100-year, 24-hour storm event <br />with adequate freeboard to ensure no overtopping of the embankment. <br />Pond No. 002 - North Ditch <br />In order to contain runoff from the existing reclaimed, a contour ditch <br />is required along the reclaimed area north of Pond No. 002, flowing into <br />Pond No. 002 (see Exhibit 13-4). For the design of the contour ditch, <br />the SEDIMOT II model was used to predict the runoff from the watershed. <br />The peak inflow rate for the ditch was assumed to be the same as for <br />Pond No. 002 for a conservative approach. The 10-year, 24-hour storm <br />event was used in the design (see Addendum A) and the peak flow is 3.45 <br />cfs. Based on this peak discharge, the Dodson and Associates, Inc.'s <br />computer software was used to design the ditch sections based on the <br />• solution to Manning's equation. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.