My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO24575
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO24575
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:35 PM
Creation date
11/20/2007 4:48:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Hydrology
Doc Date
2/4/1999
Doc Name
RATIONALE FOR PUBLIC NOTICE
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I <br />Page No. 6 <br />Perini[ No. CO-0045161 <br />B. hIONTi'ORING REQUIREhIENTS <br />2. ,salinity Parameters <br />In order to obtain an indication of the quantity of Salinity, measured as total dissolved solids (TDS) being dischazged from <br />the site, the penrtittee shall monitor the wastewa[er effluent at the following frequen•=ies: <br />Ontfalls Frequency Samole Tv~e <br />OOIa, 002a, 003a, 004a, OOSa, 006a, 007a, 008a, 009a, OlOa Quarterly Grab <br />Self-motti[oring samples taken in compliance with [he monitoring requires specified above shall be taken at [hose loca[ions <br />lis[ed in Part I.B.1. Where, based on a minimum of five samples, the pertnittee demonstrates [o the satisfaction of the <br />Di~rision tha[ [he level of total dissolved solids (TDS) in the effluen[ can be calculzned based upon the level of electrical <br />cottductiviry, the pertnittee may measttre and report TDS in terms of electrical cottductiviry. <br />3. Three-Time Analysis <br />The permittee shall perform athree-time analysis for BETX (the combination of benzene, ethylbenzene, toluene and <br />zylene), at outfall 002b, [he outfall from the Washbay Pond to the Work Area Pond. Grab samples shall be collected a[ <br />outfall 002b, prior [o entering the Work Area Pond, once each consecutive discharge episode from outfa11002b until three <br />saznples have been collected, regazdless of whether dischazge occurs at the [ime from the Work Area Pond (outfall 002a - <br />tlte dischazge [o Taylor Creek). The pertnittee shall submi[ [he results of each sample se[ within 45 days after the sample <br />dale under sepazate cover to the address specified in Pan I.E.1. <br />If the results indicate an actual or po[ential ezccedence of the applicable standard for BETX, the petmi[ may be amended to <br />incorpora[e limitations and monitoring, as allowed under Part II.B.S of this permit, subjec[ [o public nonce provisions. <br />C. DEFIIVTTIONS OF TERMS <br />1. "Composite' sample is a minimum of four grab samples collec[ed a[ equally spaced [wo hour intervals and proportioned <br />according [o flow. <br />2. "Con[inuous" measurement, is a meastrement obtained from an automatic recording device which continually measures <br />provides measurements. <br />3. 'Daily Maximum limitation" means the limitation for this pazame[er shall be applied as an instantaneous maximum (or, for <br />pH or DO, instantaneous minimum) value. The instantaneous value is defined as the analytical result of any individual <br />saznple. DMRs shall include the maximum (and/or minimum) of all instantaneous values within [he calendaz month. Any <br />instantaneous value beyond the noted daily maximum limitation for the indicated pazameter shall be considered a violation <br />of this permit. <br />4. 'Grab" sample, is a single 'dip and take" sample so as to be representative of the pazameter being monitored. <br />5. "La-sim" measurement is defined as a single reading, observation or measurement taken in the field at the point of <br />discharge. <br />6. "Uatan[aneous" measuremen[ is a single reading, observation, or measurement performed on site using existing monitoring <br />facilities. <br />7. "N[on[hly measuremen[ frequency'. Only one sample is required [o be collec[ed [luring the calendar month. The sample <br />ma.y be collec[ed a[ any [ime during the calendaz month if a continual dischazge occurs. If the discharge is intermitten[, <br />Then only one sample shall be collec[ed during the portion of the month that discharge occurs. Additional samples may be <br />collec[ed a[ the permittee's discretion. Al] samples shall be repotted on the Discharge Monitoring Report. <br />8. "Quatterly measurement frequency'. Only one sample is required to be collected during [he calendar gttarter. The sample <br />ma.y be collected a[ any [ime during the calendaz gttarter if a continual dischazge occurs. If the discharge is intermitten[, <br />them only one sample shall be collected during the portion of the quaver tha[ dischazge occurs. Additional samples may be <br />collected a[ the permittee's discretion. AlI samples shall be repotted [on the Dischar.;e Monitoring Report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.