Laserfiche WebLink
<br />9. Weeds will be mowed as needed to eliminate competition for the <br />seeded species. <br />10. ':he small areas above the quarry face could possibly require <br />seeding. If this is necessary the same seed mixture will be utilized, <br />however, due to the slope the seed will be hydro mulched. <br />11. Refer to drawing 677-4 which delineates final contours and <br />reclamation. <br />~J <br /> <br />