My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-12-11_PERMIT FILE - C1981014A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981014
>
2001-12-11_PERMIT FILE - C1981014A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2017 8:47:06 AM
Creation date
11/20/2007 4:36:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
NPDES PERMIT COR-040183 (MINE SITE)
Section_Exhibit Name
EXHIBIT 04 Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART I Page 11 of 20 <br />Permit No. COR-040000 <br />D. BASIC TERMS AND CONDITION -ALL FACILITIES (cont.) <br />• otherwise provided by the Division, the pennittee shall have 30 days after such notification to both make the <br />necessary changes [o [he plan and [o implement them. <br />The permittee shall amend the plan whenever [here is a change in design, constmc[ion. operation, or <br />maintenance which has a significant effect on the potential for the discharge of pollutants to the waters of the <br />Slate, or if the SWMP proves to be ineffective in achieving the general objectives of controlling pollutants in <br />stormwater dischazges associated with mining activity. Amendments to the plan shall be summarized in the <br />Aanual or Compliance Report. <br />3. Prohibition of Non-stormwater Dsscharges <br />a. Except as provided in paragraph b, below, all discharges authorized by this permit shall be composed <br />entirely of stormwater. Dischazges of water other than stormwater must be addressed in a separate CDPS <br />penni[ issued for drat dischazge. <br />b. Dsschazges from the following sources that are combined with stormwater discharges associated with mining <br />activity may be authorized by this permit, provided that the non-stormwater component of the discharge is <br />identified in [he SWMP (see Part [.B.4.g of the permit): fire fighting activities, uncontaminated wmpressor <br />condensate, irrigation drainage, lawn watering, air conditioner condensate, uncontaminated seeps and springs, <br />and foundation or footing drains where flows are not contaminated. <br />4. Releases in Excess of Reportable Opsntities <br />"This permit does not relieve the permittee of the reporting requiremenu of 40 CFR 110, 40 CFR 1 l7 or 40 CFR <br />302. Any discharge of hazardous material must be handled in accordance with the Division's Notification <br />• Requirements (see Part II.A.3 of the permit). ' <br />5. Facility Inspections <br />a. Active Mining Operations. Qualified personnel identified by the operator shall make a thorough inspection of <br />their stormwarer management system, a[ least twice per year (in the spring and fall). Where semi-annual site <br />inspections are shown in the plan to be impracticable because an employee is not stationed or does not routinely <br />visit the site, inspections as required in this part shall be conducted at appropriate intervals specified in the plan, <br />but never less than once in two years. These inspectioos must be documented and summari~r~t in the Annual <br />Report (see Part I.E.1 of the permit). <br />b. Inactive Mining Operations. Qualified personnel identified by the operator shall make a thorough inspection <br />of their stormwa[er management system, at least once per yeaz. Where annual inspections are shown in the <br />plan to be impracticable, because an employee is not stationed at or does not routinely visit the site, an <br />inspection and certification is required once every three years by a Registered-Professional Engineer that the site <br />is in compliance with the plan. These inspections must be documented and si~.nn,a,;~ei in the Compliance <br />Report (see Pan I. E.1 of the permit). <br />c. Remediation Operations. Qualified personnel identified by the operator shall make a thorough inspection of <br />their stormwater management system, at least once per yeaz (in the field season). Where annual site inspections <br />are shown in the plan to be impracticable, because an employee is not stationed at or does no[ routinely visit the <br />site, inspections as required in this pan shall be conducted az appropriate intervals specified in the plan, but <br />never less than once in two years. These inspections must be documented and summari_;r_d in the Annual <br />Report (see Part 1.E.1 of the permit). <br />d. Inspection Requirements -ALL Operations. The inspections as required above must include the following: <br />1) Disturbed areas and areas used for material storage that are exposed [o precipitation shall be inspected for <br />evidence of, or the potential for, pollutants entering the drainage system. Erosion and sediment control <br />
The URL can be used to link to this page
Your browser does not support the video tag.