Laserfiche WebLink
PART 1 Page 9 of 20 <br />Permi[ No. COR-040000 <br />C. STORMWATER MANAGEMENT PLAN -INACTIVE MINES (cont.) <br />i <br />• 3. Stormwater Manaeement Controls -Identification of Sources and Best Manaeement Practices <br />The SWMP shall identify potential sources of pollutants a[ the site and assess the potential of these sources to <br />contribute pollutants to stormwater discharges associa[ed with [Wining activities. The SWMP must also describe <br />appropriate Best Management practices (BMPs) to reduce [he potential of these sources to contribute pollutants to <br />stormwater discharges. The appropriateness and priorities of controls in the plan shall reflect identified potential <br />sources of pollutants at the mining site. The description of the BMPs shall include: <br />a. Stormwater Diversion: Describe how and where stormwa[er will be diverted away from potential pollutant <br />sources [o prevent s[ormwa[er contamination. <br />b. Sediment and Erosion Prevention: Describe practices tha[ will be used to reduce erosion and prevent sedimen[ <br />delivery to State waters. These could include structural (such as silt fences, sedimen[ ponds, drop structures, <br />check dams) and non-s[ructural (such as mulching and revegetation) methods. <br />4. Comprehensive Insoedion <br />The SWMP shall identify qualified personnel that shall inspec[ designated areas. InspectioWS required by this part <br />shall be conducted annually. Where amual inspec[ions are impracticable, certification is required once every three <br />years by a Registered Professional Engineer [hat the site is in compliance with the SWMP. <br />5. Additional SWMP Items for Sites Seekine Permit Termination <br />Additional requirements apply in the event that the permittee wishes [o remediate the inactive mine site and <br />• [erminate permit coverage. If the site is already covered by this permit, the permittce shall notify the Division as to <br />f the change in status. Notification shall be prior to the implementation of the remediation work, if possible. The <br />SWMP must be amended to include the following items, prior to implementation of the remediation work, if <br />possible: <br />a. Documentation of Permission: The plan shall include documentation of permission from the land owner, if <br />the remediation work is undertaken by someone other than the land owner. <br />b. Photographs: The plan shall include photographs documenting the condition of the inactive mine site before any <br />remedial action has occurred. For recently active mines, photographs of the active mining phase tray be <br />substituted. <br />c. Description of Remedial Action: The plan shall describe the remedial action that will take place to minimise <br />or elimina[e the water quality impacts from the mine waste. The description shall include: <br />- Remediation Goal Sta[ement; <br />- the charaaeristics of the mineralogic content of the mine-waste, and estimated volume of the waste; <br />- description of any materials tha[ will be mixed into the mine waste on site; and <br />- estimated surface azea of the fmal site, and estimated angle of side slopes. <br />Description of BMPs during Remediation AMivities: The plan shall describe BMPs that will be implemented <br />[o reduce the potential of remediation activities to contribute pollutants to stormwater discharges. Activities that <br />shall be addressed include vehicle maintenance, earth moving, material storage and spill prevention. <br />e. Procedures for Disposal of Water Stored Within Mine Waste: The permi[tce must describe how any water <br />scored within the mine waste will be collected and/or routed [o any storage or treatmen[ facilities. No discharge <br />of Otis water shall be made to waters of the state, unless separate permit coverage is obtained. <br />• f. Description of Permanent BMPs, Final Site Stabilvation, and Ukimate Land Use: The plan shall include a <br />description of the specific permanent measures that will be installed or used a[ the mine-waste site. The <br />description shall include any of the following if appropriate: specifications for capping or isolazion of the <br />