Laserfiche WebLink
CATERPILLAR INC. <br />• FLEET PRODUCTION AND COST ANALYSIS <br />Yoast Reclamation Bond SCC 20-FEB-1 Page -16- <br />-------------------------------------------------------------------------------- <br />Productivity and Cost -- TS RE PL -K FPC-lc2 <br />-----------------Loader-------Haulerl----Hauler2- ---Potential Production--- <br />Qty S Model 4-637E I I TONS /Hour Avg MPH( <br />BCY /Load ( 2,518 Lbs/BCY). 25.62 I I I <br />Hauler - Payload, TONS....... 32.25 I 1637E 2,108 9.9 I <br />- ~ of Max GVW ....... 94.4 I I I <br />Load Time, Minutes .......... 1.00 1 -------------------------- <br />--Hauler Cycle Time---------------- <br />• <br />• <br />Load ........................ 1. 00 <br />Haul . ........................ 1. 13 <br />Dump and Maneuver............ 0. 60 <br />Return ....................... 0. 94 <br /> Potential Cycle Time.. 3. 67 <br />Wait on Slow Hauler.......... <br />Wait to Load.[Bunching-AVG ]. 0. 00 <br /> <br />------ Total Cycle Time...... <br />------------------------- 3. <br />---- 67 <br />-------------- <br />----Operating Schedule---- <br />Operator Efficiency 90&I <br />Sched Hrs/Year 2,000 I <br />-------------------------- <br />-----Fleet Estimates------ <br />Fleet Availability 83.01 <br />TONS /Sched Hr 1,575 I <br />Total TONS 121,668 I <br />Sched Hrs Reqd 77 I <br />Total $ 55,953 I <br />$ per TON 0.460 I <br />TONS /Year 3,149,085 I <br />Years Required 0.04 I <br />-------------------------- <br />HAUL - Travel Time b Speeds <br />Yoast Reclamation Bond <br />________ ____________ ____________ _______________ _______ _________________ <br />I Course I Course I Material (Density Lbs perlIni tiall I HAULER 637E I <br />I Name I Desc I Qty TONS I LCY I HCY I Speed I I ID YOAST I <br />-------- ------------ ------------ ------- ------- --MPH-- I Tires 37.25-35 I <br />1K 1Wadge Pit I 121,6681 2,075 12,518 1 0.00 I I Type E3 I <br />-------- ------------ ------------ ------- ------- ------- I Speed Corr. 1.001 <br />Empty Wt., TONS 56.04 Payload, TONS 32.25 Code C134 I Alt. Corr.. 0.891 <br />I HAUL Distance Rolling Grade MPH Potential Segment Speed Cumulative) <br />1Segment FEET Resis t~ 6 Limit Speed Max at End Minutes I <br />I 1. 1,600 5.00 0.00 30.00 20.11 19.77 0.00 1.13 I <br />------------------------------------------------------------------------------ <br />25-2-13 Revised 02/01 <br />