My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54840
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:50 PM
Creation date
11/20/2007 4:20:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 47 Design Criteria for MB-5 & MB-6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• In order to minimize erosion, the pile will be seeded with the <br />temporary seed .mix approved in the Mt. Gunnison Mining and <br />Reclamation Plan (M&R Plan}. (See Table 4.4.5.C. entitled <br />Temporary Seeding Mix in the Mt. Gunnison M&R Plan). Necessary <br />seedbed preparation and seeding of the stockpile will take place <br />in October or November of this year. <br />Hydrologic Protection <br />There are no springs, seeps, or streams located within the area <br />to be disturbed. However the north perimeter of the stockpile <br />will be located within 50 to 25 feet of the North Fork of the <br />Gunnison River. Therefore, as part of this submittal, a variance <br />from the 100-foot stream buffer zone requirement is requested. <br />To prevent degradation of the North Fork of the Gunnison River <br />from this activity a system of ditches, berms and an incised <br />• sedimentation pond will be constructed. As shown in Attachment <br />D, a diversion ditch will be constructed to divert runoff from <br />the undisturbed area above the temporary stockpile. The ditch <br />will be sized to safely pass the peak runoff from the 25-year, <br />24-hour precipitation event. The ditch will be constructed and <br />maintained to the extent possible to prevent additional contribu- <br />tion of suspended solids to the river. Revegetation of the ditch <br />will be done if necessary to reduce sediment loading, although it <br />is unlikely that this will be necessary, given that the ditch <br />gradient averages 1% and the design runoff velocity from a <br />25-year, 24-hour event will not exceed 3.1 feet per second. <br />Ditch calculations are presented in Attachment F. <br />As shown in Attachment D, a berm will be constructed between the <br />stockpile and' the river to help prevent disturbed area runoff <br />from entering the river. A ditch on the inside of the berm will <br />be constructed to divert all disturbed area runoff to the incised <br />• sedimentation pond located as shown in Attachment D at the west <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.