My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54840
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54840
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:50 PM
Creation date
11/20/2007 4:20:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Exhibit 47 Design Criteria for MB-5 & MB-6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• A mbdification to the NPDES permit issued for the Mt. Gunnison <br />mine to allow for the discharge of water from the ~aydown area <br />sedimentation pond to the North Fork of the Gunnison River will <br />be applied for prior to June 1 ,1984. A copy of the letter <br />transmitting the application as well as the modified permit will <br />be supplied to the CMLRD. Prior to approval of the modification, <br />water from the sedimentation pond will be diverted as necessary <br />through the ditch to Sedimentation Pond MB #2 as shown on <br />Attachment B. <br />RECLAMATION <br />Upon termination of mining activities the laydown area will be <br />reclaimed as part of the surface facilities and in accordance <br />with the reclamation plan described in Section 4.4 of the Mt. <br />Gunnison MRP. <br />• As shown in Figure 4.5.7.A to the original revision incorporating <br />the ten acres into the 5-year permit area and attached for your <br />reference as Attachment E a5 out 80% of the laydown area was <br />covered by the moist mixed shrub community and the remainder by <br />the dry meadow plant community. Revegetation success will be <br />appropriately measured by the reference areas for these two plant <br />communities. <br />BONDING <br />Approximately 5.5 acres of land will be disturbed for this <br />activity. Revegetation costs were determined based upon the <br />calculations and assumptions used in Table 4.8.1.A (revised <br />March, 1984) of the Mt. Gunnison MRP, except that topsoil <br />replacement costs were based upon the hourly rental cost of a D8 <br />bulldozer which would be used to redistribute the topsoil onto <br />the disturbed laydown area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.