Laserfiche WebLink
• Reveaetation Cost Estimate <br />Activity Cost/Acre <br />Ripping $ 98 <br />Topsoiling (10 hrs @ $85/hr using a <br />D8 bulldozer to redistribute topsoil) S 850 <br />Seedbed Preparation and Fertilization $ 180 <br />Drill Seeding 5 600 <br />Mulching S 400 <br />$ 2,128 <br />5.5 acres x $2128/acre 511,704 <br />Wildlife shrub clusters (purchase of tublings <br />plus labor to plant shrubs) (1.5 acres) $ 1,150 <br />$12,854 <br />10X Contingency $ 1,300 <br />Total Estimated Reclamation Costs <br />for Bonding Purposes $14,154 <br /> <br />The current Mt. Gunnison reclamation bond is $1 .9 M. Current <br />estimated reclamation costs for the acreage presently disturbed <br />at the mine is 1.79 R. Therefore the additional cost of reclaim- <br />ing the area proposed in this application will not require an <br />increase in bond. <br /> <br />