My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54738
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54738
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:44 PM
Creation date
11/20/2007 4:18:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997054
IBM Index Class Name
Permit File
Doc Date
9/9/1997
Doc Name
MEMO FN M-97-054 ADEQUACY ITEMS
From
LARRY D OEHLER
To
MITCH ALBERT
Section_Exhibit Name
EXHIBIT C PRE-MINING & MINING PLAN MAPS OF AFFECTED LANDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Conttlbulon CMLRB 11I Permit Application <br />Agile Stone Syatema, Inc. <br />5. Will the Granite Quarry haul roads to and from the upper benches be within the <br />affected land boundary? Show the location of these roads on the Mining Plan <br />Map. <br />The Granite Quarry haul roads to and from the upper benches will be within <br />the affected land boundaries. The Mining Base Map shows 3 sets of such <br />roads primarily in the northern middle part of phases I and II. A small <br />portion of the and road to the southeast is considered affected land but is <br />isolated from the larger portion of the affected mining land in Phase III. <br />This road will only be used occasionally as it is more out of the way then the <br />other more direct roads and this road has already been bonded for <br />reclamation with an exploration permit filed with the Division. <br />6. Will the rock processing equipment at the Granite Ouarry be portable or will it be <br />mounted on foundations or footings? If any concrete structures over a few cubic <br />yards will be constructed for the processing equipment, please provide <br />information regarding dimensions and whether or not the concrete will be <br />reinforced. <br />The rock equipment at the Granite quarry will be portable. <br />Provide the dimensions of all roads to be constructed or improved from existing <br />roads. <br />Ezhibit D provides all road dimensions. <br />8. You have stated that the Sandstone Quarry was mined pre-law. Provide the <br />dimensions of the pre-law quarry as compared to the planned dimensions of <br />proposed quarry. Show this information on a map with drawings made to scale. <br />Will all of the pre-law quarry be redisturbed? <br />There is no known information on the pre law dimensions of the sandstone <br />quarry. All of the re law sandstone quarry will be disturbed and <br />subsequently re la ed. <br />9. Your plan says that some topsoil may be available for salvage from the Sandstone <br />Quarry processing area. Please be more specific and describe the amount of <br />topsoil available for salvage from this area and describe how much topsoil will be <br />salvaged. <br />
The URL can be used to link to this page
Your browser does not support the video tag.