Laserfiche WebLink
topsoil dist-trks Bader <br />COLOWYO COAL COMPANY <br />2003-iR-56 <br />TOPSOIL DISTRIBUTION COSTS <br />TRUCKS AND LOADERS <br />REVISED OCTOBER 2003 <br /> Loose Bank Pmdudlon Equipnler4 Toial <br /> CuSb Yartls DVOX: VeNS Reu Equipment Cosu Casa <br />Haul Routes (LaYI (ecy) (LCy/Ilr.) Mours ($0¢) ($) <br />RT 15H to eazt 1 1 <br />)]]HaulTmcks 103,500 90,000 31] 326 §18].51 561,222 <br />9920 LOa0er 103,500 90,000 B3] 124 $195.2] 524,146 <br />D10N DOZer 103,500 90.000 ]dd 139 $165.80 §23,W5 <br />RT 15G 10 east <br />A] Haul Tmdu 5.150 5,000 2]6 21 $18].51 5:1,906 <br />992C LOatler 5.]50 5,000 83] ] $195.D $1,341 <br />OtON DOZer 5,]50 5,000 ]db B 5165.80 $1,281 <br />RT 15L to eazt <br />]]]Haul Trucks 533.11] 463,580 313 1,]03 $18].51 $319,3]6 <br />992C Loader 533,11] 463,580 83] 63] 5195.2] $124,3]5 <br />D10N OOZer 533,11] 463,580 ]b ]1] $165.80 §118.805 <br />RT 1SI b east <br />T/]HaulTmdu 398119 348.190 262 1,520 $18].51 $284,928 <br />992C Loatler 398,119 348,190 83] 4T6 $195.2] 592,880 <br />DIDN Dozer 398,118 346,190 ]44 535 $165.80 $88.]20 <br />PT 15A io east <br />]]]HauITmW 409,803 355,350 22d 1,829 $18].51 $343,04$ <br />892C Loader 409,803 356,350 83] 490 $195.2] 595,606 <br />D10N Dozer 609,803 358,350 ]44 551 §165.80 $91,324 <br />SUBTOTAL EAST PR <br />Tz]Haul Trucks 1,450,288 1,281,120 5,400 $16].51 $1,012,4]8 <br />992C Loader 1,450,288 1,261,120 1,]33 $195.2] 5338,349 <br />010N Dozer 1,450,288 1,261,120 1,949 $165.80 $323,196 <br />6u01olal equipment 1.450,208 1,261,120 9,082 §184.33 51,8)4,022 <br />RT 15A-] <br />n] Haul Tmcks 15,065 13,100 28] 52 $18].51 $9,833 <br />992C LOatler i5.Ofi5 13.100 B3] 18 $195.21 $3.515 <br />D10N DOZw 15,065 13,100 ]92 19 $165.80 $3,154 <br />RT 15A-B <br />]]] Haul TmckS 10399 9,043 232 65 $18].51 58,408 <br />9920 Loader 10,399 9,043 83] 12 $195.2] S2p26 <br />D10N DOZef 10,399 9,043 ]92 13 $165.BD $2,1]T <br />RT 15A-9 <br />T/]Haul Trucks 12,0]5 10.500 214 58 $18].51 $10,584 <br />B92C Loader 12,0]5 10,500 B3] td 5195.2] 52,81] <br />D10N Dozer 12,0]5 10,500 ]92 15 5165.80 $2,528 <br />RT 15A -10 <br />'?/ Haul Lucb 155,848 135,520 168 928 $18].51 $1]4,102 <br />892C Loader 155,848 135,520 83) 186 4195.2] $36.359 <br />010N OOZer (55,648 135,520 ]92 18] $165.80 $32.626 <br />RT 15A-11 <br />77]MeulTmdca ],620 fi,B00 1]3 d5 E1 BJ.51 $8,484 <br />9920 i.aeder ),820 6.800 B3] 9 $195.2] $1,626 <br />D10N OOZer ],820 8,800 ]92 10 $185.80 $1,63] <br />RT 15A-12 <br />]]/ Haul Tmcks 10.192 8.863 161 83 $18].51 $11,890 <br />9920 Loatler 10.182 8,863 83T 12 5195.2] $2,3]8 <br />D10N DOZer 10,192 0,863 ]92 13 E1fi$.BO 52,134 <br />RT 15A-13 <br />D-11 <br />