Laserfiche WebLink
topsoil dist-scraper <br />COLOWVO COAL COMPANY <br />2003 - TR - 56 <br />TOPSOIL DISTRIBUTION COSTS <br />SCRAPERS <br />Haul Routes <br />RT 15A to fact <br />63]E Scrapers <br />RT 15E to facl <br />637E Scrapers <br />RT 15F to facil <br />637E Scmpers <br />RT 151-/ to facil <br />637E Scrapers <br />RT 17A to facil <br />637E Scrapers <br />RT 1]B to taco <br />637E Scrapers <br />RT 17C to hcil <br />637E Scrapers <br />Subtotal FacllBies <br />RT 16A to sec 16 <br />637E Scrapers <br />RT 16D to sec 16 <br />63]E Scrapers <br />SuMOtal Sec 18 p8 <br />RT 16B to east <br />837E Suapers <br />Subtotal east pe <br />TOTAL ALL TOPSOIL HAULING <br />637E Scrapers <br />Loose Bank Production Equipment Total <br />Cubic Vartls Cubk Vartls Rate Equipment Costs Costs <br />(LLy) lety) (I-cymr.) Hours (Smr.) ($) <br /> <br />1.15 1 <br />589,329 512,460 265 2,223.9 $202.16 $469,580 <br />3,950 3,000 909 8.4 $202.16 $1,705 <br />11,500 10,000 624 18.4 $202.16 $3,726 <br />2,070 1,800 349 5.9 5202.16 $1,199 <br />6,440 5.600 592 10.9 $202.16 $2,199 <br />4,025 3.500 592 8.8 $202.18 $1,374 <br />3,450 3,000 581 5.9 $202.18 $1,200 <br /> <br />620,286 539.360 Z]2 2,280.3 $202.18 $480,984 <br />234,154 203,612 230 1,018.1 $202.18 $205,811 <br />5],500 50,000 339 169.6 $202.16 $34,290 <br /> <br />291,fi54 253,612 246 1,188 $202.16 $240,101 <br />117,8]5 102,500 228 521.6 $202.16 $105,441 <br />11],875 102,500 228 522 $202.16 $105,441 <br /> <br />1,029,793 895,472 258 3,990 $806,526 <br />REVISED OCTOBER 2003 <br />Remarks <br />Bgmr. Rate = <br />Bcymr. Rate = <br />Bcymr. Rate = <br />Bcymr. Rate = <br />Bcymr. Rare = <br />Bcymr. Rate= <br />Bcymr. Rate = <br />265.0 <br />409.0 <br />624.0 <br />349.0 <br />ss2.o <br />592.0 <br />561.0 <br />Bcymr. Rate= 230.0 <br />Bgmr. Rate= 339.0 <br />Bgmr. Rate = 226.0 <br />D-10 <br />