Laserfiche WebLink
topsoil tlist-trks Bader <br />COLOW YO COAL COMPANY <br />2003 - TR - 5fi <br />TOPSOIL DISTRIBURON COSTS <br />TRUCKS AND LOADERS <br />REVISED OCTOBER 2003 <br /> Loose Bank Pr04utMipn Equipment Total <br /> Cubic VarGa CUbk YalQa Rate Equipment Costa Costa <br />Haul Routes (Lq) (BCy) (LCy01r) Hours ($mr.) ($) <br />]]]Haul Tlu0ka 4,11] 3,560 144 29 $16].51 $5,3]0 <br />992C Loader 4,11] 3,580 83] 5 $195.2] $960 <br />D10N DOZer 4,11] 3,580 ]92 5 $165.80 $862 <br />RT 1512 <br />])]Haul Tlucks 10,695 9,300 466 23 E18Z51 $4,302 <br />992C Loafer 10,695 9.300 83) 13 $195.2] $2,495 <br />D10N DOZer t0,fi95 9,300 J92 14 $165.00 $2,239 <br />SUBTOTAL FACILRIES <br />]]] Heul TmCks 226,212 198706 1,242 $16].51 $232,956 <br />992C LOa0er 226,212 198708 2]0 $195.2) $52,A5 <br />D10N Dozer 226,212 198.]08 2afi $165.80 $4),356 <br />Subtotal equipment 226,212 196706 1,)98 $185.23 $333,08] <br />RT 15A to west <br />P]Maul Trucks 920.435 800,3]8 2l5 3,34] $18].51 $62],603 <br />992C LOa0er 920,435 800,3]8 83] 1,100 $195.2] $214,]35 <br />D10N Dozer 920.435 800,3]8 ]92 1,162 $185.80 $192,fi8J <br />Ri 158 t0 west <br />P]HaulTmtsu 412,985 359,11) 309 1,33] $18].51 $250,fi11 <br />992C LOatler 412,985 359,11] 83] 493 $195.2] $96,346 <br />D10N OOZer 412,985 359,11] ]92 521 $165.80 $86p56 <br />SUBTOTAL W EST PIT <br />]]]HaulTmcka 1,333,419 1,159,495 4,684 $18].51 $6]6.213 <br />992C Loafer 1,333,419 1,159,495 1,593 $1952] $311,083 <br />D10N DOZer 1,333,419 1,159,495 1,684 $165.50 $2)9,143 <br />6u5tOtdl equipment 1,333,419 1,159.495 ],960 $184.4] $1,668,639 <br />RT 15J 1o section 18 <br />]JJ HaulTmcks 134,992 11].384 223 605 $18].51 $113,508 <br />992C LOatler 134,992 11],384 03] 181 $195.2] $31,493 <br />DIDN OOZer 134.992 11],384 )4d 181 $18560 $30.083 <br />$YD101al Section l6 Pit 134,992 11],384 946 $164.6$ $1]5,086 <br />TOTAL ALL TOPSOIL MAULING <br />]>]HaulTmcb 3.144,911 2,]34]05 264 11,931 $18].51 $2,23],155 <br />992C Loader 83] 375) $195.2] $]33,]00 <br />D10N DOZer >W 4.100 816560 $6]9.T/] <br />Subtotal Equipment 3.144,911 2.>34,>OS 19)88 $184 d9 $3,fi50,632 <br />D-12 <br />