Laserfiche WebLink
CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />Task # : 009 State :Colorado <br />Date : 03/14/2003 County : Deka <br />User : JRS Site :Terror Creek Loadout <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 04 <br />Task description :Finish Grade Entire Site <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H <br />Attachmentno.l:NA <br />Attachment no. 2 : NA <br />Cost Breakdown <br /> .Utilization <br />Ownership cosUhour : $35.72 NA <br />Grader operating cosUhour: $39.94 100 <br />Ripper operating cosUhour : $0.00 NA <br />OperatorcosUhour: $24.92 NA <br />Total unit cosUhour : $100.58 Total fleet cosUhour <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : .4,50 acres <br />$100,58 <br />Source of estimated acreage :Map 5 <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees ' `et Odegrees, blade is perpendicular <br />Effective blade length : 12.10 fee[ to direMion of travel. <br />Width of blade overlap per pass : 2.00 feet <br />Net grading Or ripping width per pass : 10. f0 feet " "width of ripper beam on ripping applications <br />Unadjusted houry unit production : }.5303 acres/hour <br />Job Condition Correction Factors Source <br />Average site altitude : 5,800 feet Altitude adjustment factor : 1.00 (Cat HB) <br /> Job efficiency adjustment factor : 0.85 (1sh/d, mod.) <br /> Net job correction : 0.8500 muRiplier <br /> <br />Adjusted hourly unit production : 1.3008 acres/hour <br />Adjusted hourly fleet production : 1,3008 acres/hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) Total job time : 3.46 hours <br />Unit cost : $77.33 per acre Total job cost : $348 <br />Permitlob # : C-83-059 <br />Abbreviation :none <br />Filename : C059-009 <br />Horsepower: 215 <br />Shift basis : 7 per day <br />Data source : (CRG) <br />