My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53974
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53974
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:15 PM
Creation date
11/20/2007 3:59:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059A
IBM Index Class Name
Permit File
Doc Date
10/21/2003
Section_Exhibit Name
Exhibit 10 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Agency or organization name ;Colorado DiNslon Of Minerels And Geology <br />Permit or other Job action ;Permit Renewal 04 <br />Task description :Bac~ll Sediment and Du_pout Pond <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3shank ripper <br /> Utilization % <br />Ownership wsNitour : $53.00 NA <br />Operating costlhour : $87.21 100 <br />Ripper op.cosUhour: $0.00 0 <br />Operator cosUhaur: $24.01 NA <br />Total unit cost/hour : $164.22 Total fleet cosUhour <br />MATERUIL QUANTITIES <br />Initial <br />volume: 2,175 CCY <br />Horsepower: 405 <br />Swell Loose <br />factor: 1.165 volume: 2,534 LCY <br />Source of es6mated volume :Map 7 <br />Source of es6mated swell factor :CAT Handbook <br />Average push distance : 85 feet <br />Unadjusted hourly production : 1,752.8 LCYRv <br />Matedal consistency description <br />Compacted fill or embankment <br />Average push gradient : 2.00 % <br />Average site altitude : 5,800 fe <br />Matedal weight ; 2,650 Ibs/LCY <br />Weight descdpfion <br />Decomposed rock - 25% Rock, 75% Earth <br />Fleet size : 1 Dozers) <br />Unit cost : $0.230 /LCY <br />Operator skill <br />Matedal consistency <br />Dozing method <br />~sibilily <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net cortec6on <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total Job cost <br />ShHt basis : 1 per day <br />Data source : (CRG) <br />0.75 <br />1.00 <br />0.83 <br />0.80 <br />1.05 <br />1.00 <br />0.87 <br />1.00 <br />0.41 <br />22 <br />Soume <br />713.15 LCY/hr <br />713.15 LCY/hr <br /> <br />3.55 Hours <br />$583 <br />Task # : 010 State :Colorado PermiUjob# : C-83-059 <br />Date : 06H22003 County:Delta Abbreviation :none <br />User : JRS Site :Terror Creek Loadout Filename : C059-010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.