Laserfiche WebLink
IOJECT IDENTIFICATIOt <br />Task # : 006 <br />Date : 03/14/2003 <br />User: JRS <br />Agency or organization name : Coorado Division Of Minerals And Geology <br />Permit or other job action :Permit Renewal 04 <br />Task description :Rip Light Use Road, Water Tank, RR Track and Haul Road <br />HOURLY EQUIPMENT COST <br />MATERIAL QUANTITIES <br />Utilization <br />$53.00 NA <br />$87.21 100 <br />$8.86 100 <br />$30.65 NA <br />$179.72 Total fleet cosUhour <br />Selected estimating method : Area <br />ARemate methods - <br />Seismie <br />Area <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 3-shank ripper <br />ost Breakdown : Ownership cosUhour <br />Dozer operating cosUhour: <br />Ripper operating cosVhour <br />Operator cost/hour <br />Total unit cosVhour <br />NA NA <br />0.80 acres <br />$179.72 <br />Load factor : NA Bank volume : NA BCY <br />Rip depth (ft) : 2.00 Volume : 2,581 BCY or CCY <br />Source of estimated quantity :Map 5 <br />Source of estimated lead factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity <br />Unadjusted production <br />Area : Avg. ripping depth <br />Average ripping width <br />Average ripping length <br />Average dozer speed <br />Average maneuver time <br />Production per unit area <br />Unadjusted production <br />CIRCES Cost Estimating Software <br />BULLD02ER RIPPING WORK <br />State :Colorado <br />County :Delta <br />Site :Terror Creek Loadout <br />NA feet/second <br />NA cu. yds.lhour <br />200 feeUpass <br />7.87 feeUpass <br />200.00 feeUpass <br />88.00 feeVminute <br />0.25 minutes/pass <br />0.838 acres/hour <br />2,702.54 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) <br />Unit cost : $0.080 per cu. yd. <br />vunwoun ~,uu cuuun rnuu~s - <br />Unadjusted production <br />per selected method : 2,702.54 cu, yds.lhour <br />Site akitude : 5,800 feet <br />Altitude adjustment : 1.00 (Cat NB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted unit production : 2,243.11 cu. yds./hour <br />Adjusted fleet production : 2,243.11 cu. yds./hour <br />Total job time : 1.15 hours <br />Total job cost : $207 <br />Pennitlob # : C-83-059 <br />Abbreviation :none <br />Filename : C059-006 <br />Data source : (CRG) <br />